An aerial view of the end of Phase I, starting Phase II looking North to Old Aiken Road
Palmetto Parkway looking North from Old Aiken Road showing Bradleyville Road, Powerhouse Road, to Clearwater Road
Looking North from Clearwater Road to the 25 Connector showing grading and bridge approaches
An aerial view from 25 Connector through Ascauga Lake Road to I-20 showing grading of main line and clearing of I-20 ramps
Pile driving and 2 bents in place at Powerhouse Road
I-520 North at Atomic Road. Off Road Trucks and Roller moving and compacting dirt from one location to another.
Looking East at Atomic Road. Bridge will be constructed at this location once utilities have been removed.
I-520 South at Powerhouse Rd.
Culvert operations using a crane for pouring concrete at I-520 North at Clearwater Road.
Clearwater Road East at I-520
Driving piles on the endbents at I-520 North at US 25 Connector.
Bridge construction at US 25 Connector East at I-520.
Future bridge site at Ascauga Lake Road I-520.
Grinding debris and mulch at I-20 East at I-520.
Fine grading on I-520 at I-20 West